The constraint moved
Early in the AI buildout the scarce thing was chips: everyone wanted GPUs and there were not enough. That bottleneck eased as production ramped. What replaced it surprised much of the industry. The binding constraint became electricity.
The framing that captures 2026 is blunt: for a growing number of projects, the limit on building a new AI data center is not capital, not land, and not even chips, but whether the local grid can deliver the power. You can buy the GPUs and pour the concrete, and still be unable to turn the machine on because the electricity is not available.
This is a genuine shift in what kind of problem AI is. A software company's growth was limited by talent and code. An AI company's growth is now limited by megawatts, a constraint shared with aluminum smelters and steel mills, not with other software.
The rest of this lesson is about why electricity, of all things, became the wall, and it comes down to a mismatch: AI demand arrived in a few years, and the electricity system moves in decades.